From reservation to roof.
Six steps. Who does what at each one, and how long it takes. Reservations are open now and cost nothing; deposits stay refundable until production is scheduled. First homes ship in 2027.
- Step 1 · Now, no payment
Reserve
Tell us the model, where you want to build and when. You get a slot number in the 2027 schedule and a design call. Nothing to pay today.
- You
- Complete the pre-order form.
- Us
- Confirm your slot and delivery region within five working days.
- Step 2 · 2 weeks
Design call
A working session on your site, the model, options and a realistic budget for the whole build, not just the structure. You leave knowing what your home will cost.
- You
- Share your site: access, ground, services, climate, planning rules.
- Us
- Feasibility notes, a cost schedule and a recommended scope for the System.
- Step 3 · 8 to 12 weeks
Engineering and permits
Drawings and calculations are adapted to your site's loads and your jurisdiction's requirements, ready for a local stamp.
- You
- Appoint a local engineer if a stamp is required; submit the permit.
- Us
- Full drawing set, structural calculations, one round of revisions.
- Step 4 · 8 to 12 weeks
Production
Frames are cut on CNC, panels are assembled and insulated, metal is folded and glazing is made to order, all in one factory.
- You
- Deposit at scheduling, production payment at start.
- Us
- Weekly progress notes and a fixed ship week.
- Step 5 · 1 to 3 trucks
Delivery
The System arrives flat-packed, numbered and wrapped, in assembly order.
- You
- Foundation complete and signed off; a forklift or crane on the day.
- Us
- Delivery sequence, unloading plan and the assembly guide.
- Step 6 · Days to weeks
Assembly
Frames and connectors first, then roof cassettes and wall panels, then the window modules. A Studio is weather-tight within a week; the One and the Two within three to six weeks.
- You
- Site access and a level place for the crew to work.
- Us
- The AFRME crew builds it, start to finish, and hands over weather-tight.


When you pay, and for what.
Nothing at reservation. A refundable deposit when your slot is scheduled, a production payment when cutting starts, the balance before shipping. Site work, permits and finishes are quoted separately.
- Reservation
- Free. Holds your place in the schedule.
- Deposit
- Refundable until production is scheduled. Confirms your ship week and locks the System contents.
- Production payment
- At the start of cutting. Locks the price of the System.
- Balance
- Before your components leave the factory. Transport invoiced separately, by distance.
Percentages and dates are published with pricing to reservation holders.
Reserve a 2027 build slot.
Free, and not a commitment. A reservation holds your place in the production schedule and gets you pricing and System details before anyone else.